Worked cases

Worked case: Storage tank overfill: close inlet valve (SIL 1)

Overfill protection on an atmospheric tank with an independent radar and a motor-operated inlet valve. A small SIL 1 function where the energise-to-trip valve dominates.

3 min read · First Out AI knowledge library

Example drawing: Storage tank overfill: close inlet valve (SIL 1)
Example drawing: Storage tank overfill: close inlet valve (SIL 1). Fictional unit and tags, simplified symbols.

The function

Stops a product transfer into the tank before it overfills, preventing a liquid spill and vapour cloud in the tank farm.

Safe state: Receipt valve closed and the transfer pump at the source stopped by telephone procedure.

Process safety time: 25 min from LAHH to overfill at maximum transfer rate. Required response: ≤ 2 min (valve closing time 60 s). Setpoint: LAHH at the level giving 25 min to overfill at the maximum transfer rate.

Where the target comes from (LOPA)

Operator error in transfer line-up or tank gauge failure → tank overfills → liquid spill, vapour cloud, ignition in the tank farm.

ItemValueNote
Initiating event frequency0.1 per year100 transfers per year × 1e-3 human error probability per transfer (illustrative)
Probability of ignition0.1
Probability of personnel in the tank farm0.5
Independent high level alarm (separate radar) and operator stops the transfer0.1Independent of the gauging system; 30 min available
Tolerable frequency1e-5 per yearSingle fatality (illustrative)

Mitigated event frequency without the SIF: 5.0 × 10⁻⁴ per year. Required risk reduction factor: 50. Required PFDavg: 0.02. Target: SIL 1.

Inputs (illustrative values)

GroupVotingλDU /hλDD /hλSU /hβT1PTCPartial strokeTypeSC
Independent radar LT-15011oo12e-78e-71e-70 %1 yr90 %–BSC 3
Safety PLC (shared)1oo15e-91e-600 %10 yr99 %–BSC 3
Receipt MOV XV-15011oo11e-601.6e-60 %1 yr90 %–BSC 2

Mission time 20 years, low demand (PFDavg). Failure rates are illustrative values written for First Out AI, not taken from any certificate or database.

Result (First Out AI engine v0.3.0)

MeasureValue
PFDavg0.015
SIL by probability1
SIL by IEC 61511 fault tolerance2
Systematic capabilitySC 2
Achieved SIL1 (meets SIL 1)
Required PFDavg2e-2 (met)
Mean time to spurious trip17.6 years
GroupVotingPFDavgShareHFT / requiredSFF
Independent radar LT-15011oo12.5 × 10⁻³17 %0 / 082 %
Safety PLC (shared)1oo12.3 × 10⁻⁴1 %1 / 0100 %
Receipt MOV XV-15011oo10.01382 %0 / 062 %

Engineer's reading

  • Receipt MOV XV-1501 carries 82 % of the PFDavg, so improvements there matter most.
  • With a perfect proof test (the Free plan assumption) the PFDavg would be 5.5 × 10⁻³; the difference to 0.015 is the effect of the realistic proof test coverage.

Open this example in First Out AI: SIL verification → Examples → "Storage tank overfill: close inlet valve (SIL 1)".

Written for First Out AI as engineering guidance. It supports engineering work and does not replace it; check every value against your standards, certificates and company rules with a competent functional safety engineer.