A residue treater exploded during a rushed restart after an interlock that enforced the safe sequence was overridden; lessons on permissives and start-up readiness.

2 min read · First Out AI knowledge library

What happened

On 28 August 2008 a residue treater pressure vessel in a pesticide unit at Institute, West Virginia, overpressurised and exploded during the restart of the unit. The CSB reported that an interlock designed to prevent feeding process residue before the vessel was filled with clean solvent and heated to its minimum safe temperature was overridden, a principal cause; that such bypasses had happened before with management's knowledge; that the start-up began before equipment checks and the pre-startup safety review were complete; and that operator training on a new control system was incomplete. Two workers were killed and eight injured.

Lessons for SIS and instrumentation

  • Permissive interlocks that enforce a safe sequence are safety functions. Treat them in the hazard analysis and give them the integrity and bypass control they need.
  • Routine bypassing is a design or operating problem that must be solved, not normalised.
  • Start-up readiness (pre-startup safety review, instrument checks, training) is part of the protection.

Related First Out AI articles